Past Experiences; Four Seasons, DC

Michael Mina Restaurant at the Four Seasons, Georgetown

Past Experiences; The Palms Hotel, LV

Iron Chef’s Kerry Simon had us design “Simon’s” at the Palms hotel, Las Vegas while at rockwellgroup.

Past Experiences; W Hotel on Lexington Avenue

Designed the first hotel lobby as a “Living Room” for Starwood while at Rockwellgroup.

Past Experiences; Condado Plaza, Puerto Rico

Designing always with the location in mind, the back lit wall behind the reception desk was patterned with local frangipani flowers. Designed for Blackstone Investments while at the Rockwellgroup.

Ritz Carlton, Presidential Suites, Boston

Freelance work for Rockwellgroup;

Working with Hilly Wuerz as project manager @ RG
Floor planning, rendering and materials. Excellent skills in creating material ” boxes” with amazing vendors!

Jimmy Buffet’s Margaritaville Hotel, Hollywood Beach, FL

Concept Presentation: Port Cochere, Hotel Lobby, Restaurant, Guest Rooms and Corridors Freelance work with Starwood and Rockwellgroup Project Manager: Christine Scholtz and RG Team Contribution: Floor plan and some computer rendering with PS, worked with Jamie Akers on major renderings, Materials and Presentation Layout, later developed FFE specifications, coded FP and preliminary budgets

Frank E. Campbell : The Funeral Chapel

Concept Design to Final Contruction Completion Renovation of the Chapel, Lobby, Lounges, Meeting rooms and Rooftop addition Teamwork with Bush Architects, BA (base building architect) Project Manager: Sandra Rodriguez and BA Team Project Duration: 5 years, 9.2019 until final details on 12.2025 Contribution: All Design intent drawings for all areas. Project management. Worked with Karen Foley and others to produce all computer renderings, materials and presentations, developed FFE budget, specifications and purchasing services for over 500k in FFE.

 

 

Riverside Memorial Chapel

Concept Design to Final Contruction Completion Renovation of the Chapels, Lobby, Lounges , Offices and Meeting rooms Teamwork with Bush Architects, BA (base building architect) Project Manager: Sandra Rodriguez and BA Team Project Duration: 5 years, 9.2019 until final details on 12.2025 Contribution: All Design intent drawings for all areas. Project management. Worked with Karen Foley and others to produce all computer renderings, materials and presentations, developed FFE budget, specifications and purchasing services for over 500k in FFE.